Meanwhile, our goods are created according to high quality specifications, and complying with the intercontinental sophisticated common conditions. makes certain the steadiness and consistency of the key operate of elements. We supply OEM service.
|
|||
Design and style | As per customer’s certain complex drawings | ||
As for each customer’s specific sample | |||
As per customer’s conceptual or preliminary style | |||
Suitable Drawing Format | pdf/dwg/igs/stp/and many others | ||
Processing service | EPTT, EPT,CNC maching, CNC chopping, welding, etc | ||
EPT accessible and surface area end: | |||
Stainless metal Floor complete |
SS201,SS301,SS303,SS304.SS310S,SS316,SS416 | ||
poEPTTng,passivating, sandblasting,laser engraving,Electrophoresis black,OXiHu (West EPT) Dis.de black | |||
Steel Area complete |
delicate metal,EPTT metal,mould device steel,20#,45# | ||
Zinc plating,Nickel plating,Chrome plating,OXiHu (West EPT) Dis.de Black, Carburized,Heat treatment method, PowEPTTcoated | |||
Copper: Surface area finish: |
C11000,C12000,C36000 etc | ||
Nickel plating,Chrome plating, Electrophoresis black,OXiHu (West EPT) Dis.de black,PowEPTTcoated | |||
EPTT: Floor finish: |
AL6061, AL6063,AL6082,AL7075,AL5052 | ||
Obvious Anodized, EPTT Anodized,Sandblast Anodized,PoEPTTng, Brushing, Chroming,EPTT Film | |||
MOQ | 100pcs | ||
Payment conditions | TT or L/C at sight(thirty% deposit at lEPT ) | ||
Value expression: | EX-manufacturing facility ,FOB, CIF OR CFR | ||
Supply time | 30~90 daEPTTafter obtaining deposit | ||
Application | areospace, transport creating,EPT industry |
Processing line:
Our Provider
1.Q: How EPTT is your shipping and delivery time ? A: EPTTly it is 5-fifteen daEPTTif the merchandise are in stock. Or it is 25-sixty daEPTTif the products are not in stock, the distinct shipping time depends on the things and the quantity of your buy.
two.Q: Do you examination all your products just before shipping and delivery? A: Indeed, we have 100% check and NDT ahead of delivery.
three.Q: What is your phrases of payment ? A: 30% T/T in EPT ,balance just before shippment. a hundred% L/C at sight.